Every package follows the same controlled path — from a fixed scope at intake to an independently checked, issued-for-construction deliverable.
You send the package — drawings, data sheets, whatever exists. We come back within days with a fixed scope, deliverables list, and schedule, not a vague estimate.
TYPICAL: 3–5 DAYSWork proceeds against your project specifications and design basis, with the founder reviewing every deliverable before it moves — not a junior sign-off.
CHECK-INS AT AGREED MILESTONESFinal package returned in your document format, cross-checked against the intake scope, with a short close-out note on anything flagged along the way.
ONE POINT OF CONTACT, START TO FINISHEvery deliverable starts from your project specifications, applicable codes (ASME, API, ISO, or the equivalent you work to), and the original design intent — not a generic template.
A second, independent check on every calculation and drawing before it moves forward — the inter-discipline check most EPC houses run internally, applied here on every scope regardless of size.
Final sign-off sits with Girish personally on every package — the same review discipline applied whether the scope is a single redline or a full tie-in dossier.
The issued package is checked back against the original intake scope, with any deviations or open items called out explicitly — not left for you to discover later.
Send whatever you have and a fixed scope comes back within days.