Quality, not just delivery

How a scope moves, and how it's checked

Every package follows the same controlled path — from a fixed scope at intake to an independently checked, issued-for-construction deliverable.

How a scope moves

Three revisions, one deliverable

A

Intake & scope fix

You send the package — drawings, data sheets, whatever exists. We come back within days with a fixed scope, deliverables list, and schedule, not a vague estimate.

TYPICAL: 3–5 DAYS
B

Execution against your standards

Work proceeds against your project specifications and design basis, with the founder reviewing every deliverable before it moves — not a junior sign-off.

CHECK-INS AT AGREED MILESTONES
C

Issued for construction

Final package returned in your document format, cross-checked against the intake scope, with a short close-out note on anything flagged along the way.

ONE POINT OF CONTACT, START TO FINISH
Quality assurance

Nothing is issued that hasn't been checked independently

P

Prepared against your design basis

Every deliverable starts from your project specifications, applicable codes (ASME, API, ISO, or the equivalent you work to), and the original design intent — not a generic template.

C

Independently checked

A second, independent check on every calculation and drawing before it moves forward — the inter-discipline check most EPC houses run internally, applied here on every scope regardless of size.

A

Approved by the principal

Final sign-off sits with Girish personally on every package — the same review discipline applied whether the scope is a single redline or a full tie-in dossier.

R

Reconciled at close-out

The issued package is checked back against the original intake scope, with any deviations or open items called out explicitly — not left for you to discover later.

CHECKED
&
TRACEABLE

What "checked" means here

  • Every calculation package is traceable — inputs, assumptions, and revisions all on record
  • Drawing revisions follow a controlled numbering & issue log, not ad hoc file naming
  • Discipline interfaces (piping ↔ stress ↔ civil ↔ instrumentation) are cross-checked before issue
  • Deviations from code or from your project specification are flagged, never silently resolved
  • Final dossier is indexed and structured for your document control system, not ours

Want the checked process on your next package?

Send whatever you have and a fixed scope comes back within days.